No saving percentage is promised in advance. Technical scope, partners and funding are checked for your specific case.
Who this is for
Flat-glass processors with traceable sheets and orders.
Activity and prerequisites
KID-2025 screening references: 23.1. These are not final classifications or eligibility confirmations.
Check business size, revenue, location, sector exclusions, aid regime and an existing product or service where the model requires it. Missing data remains a question, not a positive assessment.
What changes
Inspect incoming sheets, plan cutting and organize reuse of suitable remnants.
How the result is verified
m² new glass / m² accepted products; additionally kg broken and rejected glass.
Dimensional records, inspections and production orders by thickness, coating and product requirements.
Baseline, target and acceptance
Measure the baseline at your operation. An initial planning approach is around four representative operating weeks, extended or separated for seasonality and product mix. This is a planning method, not a programme requirement.
Agree the target after a trial or engineering assessment. Compare equivalent conditions without compromising quality, safety or hygiene. Retain absolute quantities so a normalized indicator cannot conceal losses.
Who delivers what
PixelAutomate
Sheet/remnant identity linking inspection, cutting and orders.
Process and equipment
Glass technologist and measurement/processing-equipment supplier.
These are required roles, not contracted suppliers. Responsibilities, data access, timing and acceptance are confirmed before commitment.
When not to proceed
Sold glass waste is not described as own recycling. This is distinct from reducing the weight of glass packaging.
Programme sources and related solutions
Referenced conditions and official clarifications:
Offer revision: 2026-09-07. Links lead to the official document page; a cited clarification is not approval of this proposal. Check for newer publications before application advice.
Related solutions cover part of the required scope. Additional technology remains to be validated.